Projects approved by the Board of Trustees

Status of sanctioned Projects

  • 1. Development of Inter State Bus Terminal at Baramunda, Bhubaneswar :

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    174.34 44.00 0.00 17.43

    Bhubaneswar is considered as the nerve centre for the entire state of Odisha. It’s one of those rapidly growing cities of eastern India which has greater regional influence after Kolkata. Bhubaneswar is also a major tourist destination in eastern India due to presence of numerous temples within the city. Strategic location of Bhubaneswar, close proximity to the golden quadrilateral, makes it one of the promising destination for the future development. Now to continue and maintain this development trends for the future years to come, it is very crucial to have good public transit system along with good transit infrastructure.

    In its smart city proposal, Bhubaneswar has envisaged to become a city with sustainable mobility choices and afterward the city has taken up various developmental projects to change the city’s futurescape with prioritizing the public transportation over private transportation. Success and efficiency of a good public transportation system also depends upon the infrastructure provided along with it.

    • Current Status: Disbursement going on based on BDA’s request. Expected date of Completion - December’ 2022.
  • 2. Reclamation & Peripheral Development of Ramalingeswar Tank Water Body in Berhampur (Phase-II) :

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    4.47 2.01 2.01 0.45
    • BeMC has proposed the Project of reclamation of one Water Body within its Municipality limits viz, Ramalingeswar Tank Water Body with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Project has been completed.
  • 3. Reclamation & Peripheral Development of Patnaik Tank Water Body in Paralakhemudi :

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    1.85 0.83 0.83 0.19
    • ParalakhemudeiMunicipality has proposed the Project of reclamation of one Water Body within its Municipality limits viz, Patnaik Tank Water Bodywith an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction work is in progress.Project is expected to complete on March 2022.
  • 4. Reclamation & Peripheral Development of Seven Water Bodies in Baripada Municipality :

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    12.23 5.51 5.50 1.22
    • Baripada Municipality has proposed the Project of reclamation of Seven Water Bodies (BadaPokahari, ChapalPokhari, HemsagarPokhari, Jubuliee Park Bandha No.1, Ward No. 15 Bandha, Station Bandha and JhinjiriBandha) with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Work Order issued to contractor for 7 water Bodies.Expected date of Completion - June- 2022
  • 5. Reclamation & Peripheral Development of Water Body in Subarnapur :

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    3.06 1.39 1.39 0.31
    • SubarnapurMunicipality has proposed the Project of reclamation of one Water Body within its Municipality limits with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction work is in progress.Expected date of Completion – June’ 2022

     

  • 6. Reclamation & Peripheral Development of two Water Bodies in Jeypore (KhajuriBandha&GobardhanMunda). :

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    (KhajruiBandha)     1.26 0.57 0.57 0.13
    (GobardhanMunda)1.64 0.74 0.74 0.16
    • JeyporeMunicipality has proposed the Project of reclamation of two Water Bodies within its Municipality limits viz, KhajuriBandha&GobardhanMunda with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction work is in progress.Expected date of Completion – March’ 2022
  • 7. Reclamation & Peripheral Development of one Water Body in Malkangiri. :

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    1.52 0.68 0.69 0.15
    • MalkangiriMunicipality has proposed the Project of reclamation of one Water Body within its Municipality limits with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Procurement process is in progress.
  • 8. Modern Abattoir at Gadakana, Bhubaneswar by Bhubaneswar Municipal Corporation :

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    733 330 330 73
    • Rs. 69 lakh as PMC Charges to NBCC Ltd.
    • The Modern Abattoir would bring in the latest scientific technique of meat production by providing the necessary equipment and machinery in hygienic environment.
    • The Project includes a fully equipped Slaughter house building with a capacity of 100 Sheep per day, fully equipped rendering units, Lairage Block, Office/Administrative Block and necessary Effluent Treatment Plant for proper waste discharge.
    • Current Status: Project Completed O&M Operator to be appointed.
  • 9. Bulk Water Supply – IIT, NISER, IDCO, Jatni and Khurda ULBs on Public Private Partnership (PPP) basis

    ( Rs. Lakh )
    Project Cost OUIDF Loan GoO Grant GoI Grant Promoter's Equity
    187.71 40.00 12.46 37.54 97.71
    • The Project is designed to cater to Water Supply demands of Khurda&Jatni ULBs along with the notable Academic Institutions such as IIT Bhubaneswar, NISER and other Institutional Areas, e.g. Infocity II,IIM, IIIT and other future Projects in the vicinity.
    • The project includes: Intake Works and Raw Water Transmission System of 70 MLD Capacity, Water Treatment Plant of 52 MLD Capacity, Clear Water Pumping Station of 11 ML Capacity and Clear Water Transmission System of 42 Km
    Current Status: Project has been successfully commissioned in August 2018
  • 10. Sewerage System at Sambalpur by OWSSB

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant FI/ Bank Loan Equity
    309.33 40.00 40.00 298.37 37.60
    • Sambalpur town at present does not have a Sewerage System. Consequently, it not only creates an adverse health and hygiene conditions for residents of the town, but also pollutes river Mahanadi due to direct sewage discharge to the river.
    • For improving the quality of life, safety of the people in the town and abatement of pollution of River Mahanadi, Sewerage System is proposed at Bhatra which includes Sewerage Treatment Plant (42 MLD), 11 nos. Pumping Stations, Raising Mains of 26 kms and Distribution Network of 150 kms. Apart from these, other components such as Construction of Toilets, Dhobi Ghat etc. have also been proposed.
    • Current Status: EPC Contractor has been appointed and Construction work is in progress, expected to be completed by January 2020
  • 11. Augmentation of Water Supply to Gopalpur NAC

    ( Rs. Lakh )

    Project Cost OUIDF Loan Equity
    5.29 3.6 1.69
    • Gopalpur is one of the major tourist attraction spots in the State of Odisha, apart from Puri, because of its attractive sea beach. The existing Water Supply connection coverage is of only 24% of the population.
    • The Project proposes to augment the existing Water Supply for Gopalpur NAC through transmission of water from the tapping point of Rushikulya Joint Water Supply System to an existing hill top reservoir thereby connecting to Distribution Network. The Augmentation of Water Supply to Gopalpur NAC is proposed with a design period of 30 years.
    • The Project includes Laying of Gravity Mains, Pumping Main pipeline of 2600 m, Construction of Underground Reservoir of 4.50 Lakhs litres capacity
    • Current Status: Project commissioned July 2017.
  • 12. Improvement of Water Supply to Greater Berhampur

    ( Rs. Lakh )
    Project Cost OUIDF Loan OUIDF Grant GoO Grant State Plan / Equity
    488.94 40.00 40.00 360.00 46.94
    • The objective of the Project is to improve the distribution system and provide 24x7 water supply in the BeMC area for a 30 year period till 2045. This Project is the upstream Project of JaniviliAnicut to Berhampur and envisages 100% coverage of population though Piped Water Supply System & increase in duration of supply, reduction of non-revenue water.
    • The project includes: Transmission mains to UGRs, Construction of intake well, 17 nos. Elevated Storage Reservoirs, 10 nos. Underground Reservoirs, 21 nos. Pump houses, Distribution pipeline of 232.009 Km
    • Current Status: Project Completed.
  • 13. Reclamation and Peripheral Development of 3 Water Bodies in Berhampur

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant State Plan / Equity
    09.03 2.00 3.94 3.83
    • The Project proposes Reclamation of three Water Bodies in Berhampur viz. Ramlingeswar Tank, and Haradakhandi Tank. This would lead to recharge of ground water, control pollution and enable environmental and ecological balance.
    • The Project would include removal of weeds, silt and the dumped garbage from the tank, strengthening of embankments and providing fencing around the periphery of the tank. In addition to the core reclamation component, peripheral development is proposed in Ramlingeswar Tank and Agula Tank and would include recreational as well as revenue generating activities such as boat rides, shops for financial sustainability of the Project.
    • Current Status: Construction work is going on , expected to be completed by June 2020
  • 14. Construction of two Fish Markets in Sambalpur

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    2.73 0.96 1.5 0.27
    • The objective of the proposed Project is to set up modern Wet Markets to provide hygienic environment for sale of fish in the Municipal Area and curb the polluting effect of existing fish markets with respect to disposal of the waste generated by providing effluent treatment plant at the proposed market premises. It is proposed to set up two fish markets at Danipali and Kamalibazar with 24 and 27 shops respectively.
    • Current Status: Project has been completed at Danipalli and Kamlibazar. Construction of ETP is in progress expected to be completed by June 2020.
  • 15. Reclamation of 14 Water Bodies in Bhubaneswar

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    20.51 9.23 9.23 2.05
    • The objective of the Project is to carry out Reclamation of 14 Water Bodies in Bhubaneswar with an estimated area of about 50 acre. The Water bodies in the First phase include Nilakantha Pond-Patia, Masjid Pond, Sadhua Pond-Jeypur, MaaUgulamani Pond, GadakanaPokhari, Bhotapada Tank, Jena Sahi, Balunkeswar Tank, Fishery Pond-Laxmisagar, Kapileswar Pond, JharaPokahri-Jagamara, BadaPokhari-Begunia, Bhaguia Pond-Jadupur, SundarpadaHaja.
    • The reclamation work would include De-weeding, De-silting, Inlet/Outlet renovation/construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction completed for 12 Water Bodies, remaining 2 to be completed by March 2020.
  • 16. Reclamation of 7 Water Bodies in Sambalpur

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    03.95 01.18 02.37 00.05
    • SMC has proposed the Project of reclamation of Seven Water Bodies within its Municipal limits viz, Sakhipada, DeolBandha, Dhanupalli, Dhama Road tank, Motijharan tank, Jurabandh, Kumbharpada with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-weeding, De-silting, Inlet/Outlet renovation/construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction completed for all water Bodies.
  • 17. Construction of Modern Wet Market at Ghatikia, Bhubaneswar

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    1.67 0.59 0.75 0.33
    • Large numbers of meat shops are being operated in unhygienic environment and lack of basic facilities like water, electricity, ventilation, drainage and waste disposal. Animals are slaughtered in traditional methods on the open ground with/without further processing or dressing.
    • It is proposed to develop 12 nos. of modern and hygienic Meat Shops at Ghatikia. The meat vendors who are running their traditional shops will be relocated to the market. The proposed Wet Market will also act as a downstream facility for the Modern Abattoir being implemented by BMC at Gadakana.
    • Current Status: Project Completed allotment of Shops to be done
  • 18. Construction of Modern Wet Market at Unit –IV, Bhubaneswar

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    2.11 0.95 0.95 0.21
    • Large numbers of meat shops are being operated in unhygienic environment and lack of basic facilities like water, electricity, ventilation, drainage and waste disposal. Animals are slaughtered in traditional methods on the open ground with/without further processing or dressing.
    • It is proposed to develop 18 nos. of modern and hygienic Meat Shops at Unit-IV. The meat vendors who are running their traditional shops will be relocated to the market. The proposed Wet Market will also act as a downstream facility for the Modern Abattoir being implemented by BMC at Gadakana
    • Current Status: Project Completed allotment of Shops to be done.
  • 19. Construction & Set-up of 56 Nos. of Vending Shops in Cuttack

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    0.51 0.15 0.15 0.21
    • CMC is mandated by Order of the Hon’ble High Cuttack to create a Vending Zone to reduce congestion and facilitate proper Traffic Management near SCB Medical College in Cuttack.
    • The Project concerns relocating owners of temporary shops in the area who have been carrying on business for about last 20 to 30 years, in the specific Vending Zone with around 56 nos. Vending Units which is being constructed. The Project proposes to maintain clean and hygienic conditions in and around the Vending Zone and prevention of garbage accumulation at site.
    • Current Status: Construction has been completed and 37 shops out of 56 has been allotted. Case pending at Odisha High Court.
  • 20. Construction of Sewerage System of Rourkela Town – East

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    89.00 40.00 40.00 9.0
    • The proposed Sewerage System of Rourkela Town is divided into three Zones viz. Rourkela East, Rourkela West and Bondamunda Railway Colony Area. The Project intends to cover Rourkela East comprising mainly Koel Nagar, Jagada, Jhirpani and adjacent areas for Sewerage System.
    • The Project proposes a Sewerage Treatment Plant of 8 MLD based on Sequential Batch Reactor (SBR) technology. The sewerage system for Roureka East also comprises of Sewerage Network of 46.4 Km and 3 Pumping Stations
    • Current Status: Construction to be completed by January 2020.
  • 21. Construction of Sewerage System of Rourkela Town – West

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    315.61 40.00 40.00 235.61
    • The Project intends to cover Rourkela West, which is the Rourkela Municipal Corporation area except Rourkela-East and Bondamunda Railway Colony area for Sewerage System.
    • The Project proposes a Sewerage Treatment Plant of 40 MLD based on Sequential Batch Reactor (SBR) technology. The sewerage system also comprises of Sewerage Network of 189 Kms and 4 Pumping Stations.
    • Current Status :Construction to be completed by January 2020.
  • 22.Rehabilitation Project of Slums & Informal Settlements for EWS at Subudhipur, Bhubaneswar

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    2,240.00 1008.00 1008.00 224.00
    • This Project aims to provide housing to EWS category living in slum areas. The Project shall ensure to provide 342 Housing units to EWS category with provision of good-quality houses with modern amenities such as water, sanitation and drainage.
    • Current Status : Contractor M/s PIPL-ML Group JV is executing the Project, expected to be completed by June 2020.
  • 23.Rehabilitation Project of Slums & Informal Settlements for EWS at Satyanagar, Bhubaneswar

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    6,423.00 2,890.00 2,890.00 643.00
    • This Project aims to provide housing to EWS category living in slum areas. The Project shall ensure to provide 928 Housing units to EWS category with provision of good-quality houses with modern amenities such as water, sanitation and drainage.
    • Current Status:M/s PIPL-ML Group JV has  been appointed as contractor, construction started in 19 September 2019, expected to be completed by December 20.
  • 24.Rehabilitation Project of Slums & Informal Settlements for EWS at Gadakana, Bhubaneswar

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    9,191.00 4,000.00 4,000.00 1,191.00
    • This Project aims to provide housing to EWS category living in slum areas. The Project shall ensure to provide 1,392 Housing units to EWS category with provision of good-quality houses with modern amenities such as water, sanitation and drainage.
    • Current Status:  M/s M/s Malar URC Infras JV has  been appointed as contractor, work started the work in January 2019, expected to be completed by December 2020.
  • 25.Energy Efficient Street Lighting Projects in 5 Municipalities in Odisha (Bhubaneswar, Cuttack, Berhampur, Rourkela & Sambalpur)

    • Total Project Cost (TPC) Rs.7,560  lakh ; OUIDF Loan and Grant Rs.3252 lakh each as detailed below:

    ( Rs. Lakh )

    Name of the City Total Project Cost (TPC) OUIDF Loan OUIDF Grant
    Berhampur 1023 432 432
    Cuttack 2563 1101 1101
    Rourkela 1015 432 432
    Sambalpur 1344 584 584
    Bhubaneswar 1615 703 703
    • The Street Lighting PPP Project involves various works related to retrofitting, automation and infrastructure improvements in existing Public Street Lighting System owned and operated by the respective Municipal Corporations and covers both existing and new stretches of around 85,562 points within the Municipal Limits the 5 Project Cities
    • Current Status: Project is expected to be completed by 31-03-20
  • 26.Solid Waste Management (SWM) Project at Berhampur

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    4,44.4 200 200 44

    The Project entails implementation of Solid Waste Management Project at Berhampur by Berhampur Municipal Corporation (BeMC) on Design, Build, Operate and Transfer (DBOT) basis with provision of Secondary Transportation, Treatment and Disposal of Solid Waste in Municipal Area of BeMC and such other adjoining area as may be incorporated within the municipal limit of BeMC during the Operations & Maintenance (O&M) period of 20 years. The Project shall be located at Mahuda, around 15 km from the central point of the city. The objectives of BeMC through this Project include:

    • Establishment and operation of an efficient secondary collection and transportation system
    • Processing facility to ensure segregation and treatment of waste
    • Scientific treatment and disposal of rejects in compliance with relevant Rules

    Current Status: Project is expected to be completed by 31-06-20

  • 27. Greenfield Street Lighting Projects in 113 ULBs in Odisha

    • Total Project Cost (TPC) Rs.26,452  lakh ; OUIDF Loan and Grant Rs.3,967 lakh each.
    • The Street Lighting PPP Project involves installation of light point with Energy Efficient LED Luminaires for improved public street light services with lowest O&M Cost in the following ULBs.
    Cluster Districts No. of ULBs in Cluster No. of Light points
    Cluster A Cuttack, Dhenkanal, Ganjam, Jagatsinghpur, Khorda, Puri 36 13,992
    Cluster B Angul, Bargarh, Deogarh, Jharsuguda, Sambalpur , Sundargarh 19 17,637
    Cluster C Balasore, Bhadrak, Jajpur, Kendrapara, Keonjhar, Mayurbhanj 21 14,781
    Cluster D Balangir, Boudh, Nayagarh, Nuapada, Kandhamal, Sonepur 20 10,012
    Cluster E Malkangiri, Koraput, Nabrangpur, Raygada, Kalahandi, Gajapati 17 6,630
    Total   113 63,052

    Means of Finance

    Source % share Amount (Rs. lakh)
    OUIDF Grant to ULBs 15% 3,967
    OUIDF Loan to ULBs (Simple Rate of Interest 9.5% with Rebate of 1% to be repaid in 10 years) 15% 3,967
    Equity Contribution -  113 ULBs 10% 2,645.2
    Grant from H&UD Dept. 50% 13,226
    Contribution of Successful Bidder / SPV 10% 2,645.2
    Total 100% 26,450

    Current Status: Project is expected to be completed by 31-03-20.

  • 28. Reclamation of Water Body in Titlagarh Municipality

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    541.00 244.00 244.00 54.00
    • Titlagarh Municipality has proposed the Project of reclamation of two Water Bodies within its Municipality limits viz, Deobandha and MaharajSagar with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction started for 2 water bodies with 80% physical progress and 70% financial progress. Project is expected to complete on March 2020.
  • 29. Reclamation of Water Body in Hinjilicut Municipality

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    540.00 243.00 243.00 54.00
    • Hinjilicut Municipality has proposed the Project of reclamation of four Water Bodies within its Municipality limits viz, Deula Bandha, Bebarta Bandha, Jogi Bandha and Nuagarh Bandha with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction started for 4 water bodies with 80% physical progress and 70% financial progress. Project is expected to complete on March 2020.
  • 30. Reclamation of Water Body in Nayagarh Municipality

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    357.00 161.00 161.00 35.00
    • Nayagarh Municipality has proposed the Project of reclamation of one Water Body within its Municipality limits viz, Balangi Bandha with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction started for 1 water body with 90% physical progress and 80% financial progress. Project is expected to complete on March 2020.
  • 31. Reclamation of Water Body in Bargarh Municipality

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    1140.00 513.00 513.00 114.00
    • Bargarh Municipality has proposed the Project of reclamation of five Water Bodies within its Municipality limits viz, Neli Bandha, Mana Bandha, Danikata Bandha, Purni Bandha and Khajuri Kata with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction started for 1 water bodies with 20% physical progress and 10% financial progress. OUIDF has appointed PMC M/s Planning Solutions Pvt. Ltd. for overall project supervision. . Project is expected to complete on March 2020.
  • 32. Reclamation of Water Body in Phulbani Municipality

    ( Rs. Lakh )

    Project Cost OUIDF Loan OUIDF Grant Equity
    216.00 97.00 97.00 02.16
    • Phulbani Municipality has proposed the Project of reclamation of one Water Body within its Municipality limits viz, Bada Bandha with an objective to conserve and develop the lake periphery for better eco-system on sustainable basis.
    • The reclamation work would include De-watering, De-weeding, De-silting, Inlet / Outlet renovation / construction, strengthening of embankments and some peripheral developments.
    • Current Status: Construction will be started for 1 water body soon. OUIDF has appointed PMC @3.5% of the Project Cost. Project is expected to complete on March 2020.

STATUS OF DISBURSEMENTS :

Present Status of Sanctioned Project (Rs in Cr)(As on 31.12.2021)
Sl. No. Projects   Project cost   Sanction ULB Share Disbursement Total
Loan   Grant   Loan   Grant 
1 Sewerage System at Sambalpur by OWSSB  309.33 40.00 40.00 30.93 40.00 40.00 80.00
2 Sewerage System of Rourkela Town-East 89 40.00 40.00 8.90 40.00 40.00 80.00
3 Sewerage System of Rourkela Town-West 315.61 40.00 40.00 31.56 40.00 40.00 80.00
4 Augmentation of Water Supply to Gopalpur NAC  5.29 3.60 0.00 0.53 3.60 0.00 3.60
5 Bulk Water Supply – IIT, NISER, on PPP  Mode 187.71 40.00 0.00 18.77 40.00 0.00 40.00
6 Water Supply to Berhampur Municipal Corporation (Janibilli Project) 488.94 40.00 40.00 48.89 40.00 40.00 80.00
7 Reclamation of 2 water bodies in Berhampur  9.03 2.44 4.78 0.90 2.01 3.94 5.95
8 Reclamation of 14 Water Bodies in Bhubaneswar 20.51 9.23 9.23 2.05 7.18 7.18 14.36
9 Reclamation of 4 Water Bodies in Sambalpur 3.95 1.18 2.37 0.40 1.19 2.37 3.56
10 Reclamation of 4 Water Bodies in Hinjilicut 5.4 2.43 2.43 0.54 2.43 2.43 4.86
11 Reclamation of 7 Water Bodies in Titlagarh 5.41 2.44 2.44 0.54 0.79 0.79 1.58
12 Reclamation of 1 Water Body in Nayagarh, (12 BOM, 6 June 2018) 3.57 1.61 1.61 0.36 1.61 1.61 3.22
13 Reclamation of 5 Water Bodies in Bargarh, (12 BOM, 6 June 2018) 11.4 5.13 5.13 1.14 0.63 0.63 1.26
14 Reclamation of 1 Water Body in Kendrapara, (12 BOM, 6 June 2018) 2.8 1.27 1.25 0.28 0.28 0.27 0.55
15 Reclamation of 1 Water Body in Berhmpur (Phase-2), (12 BOM, 6 June 2018) 4.47 2.01 2.01 0.45 1.79 1.79 3.58
16 Reclamation of 3 Water Bodies in Sambalpur (Phase-2) (12 BOM, 6 June 2018) 4.87 2.19 2.19 0.49 1.25 1.25 2.50
17 Reclamation of 11 Water Bodies in Belpahar (12 BOM, 6 June 2018) 29.18 7.13 7.13 2.92 0.00 0.00 0.00
18 Reclamation of 10 Water Bodies in Brajrajnagar (12 BOM, 6 June 2018) 21.69 5.22 5.21 2.17 0.00 0.00 0.00
19 Reclamation of 2 Water Bodies in Padampur (12 BOM, 6 June 2018) 2.92 1.32 1.31 0.29 0.00 0.00 0.00
20 Reclamation of 5 Water Bodies in CMC (13th Board, 22 June 19) 10.82 4.87 4.87 1.08 0.00 0.00 0.00
21 Reclamation of 6 Water Bodies in BMC (13th Board, 22 June 19) 13.82 5.51 5.51 1.38 1.38 1.38 2.76
22 Reclamation of 1 Water Bodies in Pharlakhamundi (13th Board, 22 June 19) 1.85 0.83 0.83 0.19 0.83 0.84 1.67
23 Reclamation of 1 Water Bodies in Phulbani (13th Board, 22 June 19) 2.16 0.97 0.97 0.22 0.71 0.72 1.43
24 Reclamation of 1 Water Bodies in Jeypore (Khajuri Bandha) 1.26 0.57 0.57 0.13 0.57 0.57 1.14
25 Reclamation of 1 Water Bodies in Jeypore (Goberdhan Munda) 1.64 0.74 0.74 0.16 0.16 0.17 0.33
26 Reclamation of 1 Water Body in Baripada 12.23 5.51 5.50 1.22 1.22 1.23 2.45
27 Reclamation of 1 Water Body in Subarnpur 3.06 1.39 1.39 0.31 0.31 0.31 0.62
28 Reclamation of 1 Water Body (Baguli Bandha) in Malkangiri Municipality. 1.52 0.68 0.69 0.15 15.19 15.19 30.38
29 Modern Wet Market at Ghatikia, Bhubaneswar 1.67 0.59 0.75 0.17 0.59 0.75 1.34
30 Modern Wet Market at Unit-IV, Bhubaneswar 2.11 0.95 0.95 0.21 0.95 0.95 1.90
31 Set-up of 56 Nos. of Vending Shops in Cuttack 0.51 0.15 0.15 0.05 0.15 0.15 0.30
32 Modern Abattoir at Gadakana by BMC  7.33 3.30 3.30 0.73 2.64 2.64 5.28
33 Fish market at 2 locations in Sambalpur  2.73 0.96 1.50 0.27 0.68 0.87 1.55
34 Baramunda Bus Terminal 174.34 44.00 0.00 17.43 8.80 0.00 8.80
35 EWS Housing Project  at Gadakana 91.91 40.00 40.00 9.19 21.91 21.91 43.82
36 EWS Housing Project  at Subudhipur 22.4 10.08 10.08 2.24 6.16 6.16 12.32
37 EWS Housing Project  at Satyanagar 64.23 28.90 28.90 6.42 6.43 6.43 12.86
38 Solid Waste Management Project in Berhampur 44.44 20.00 20.00 4.44 20.00 20.00 40.00
39 Toilet on Wheels 0.56 0.25 0.25 0.06 0.15 0.15 0.30
40 Energy Efficient Project (Retrofitting)-(Phase - II)  at Bhubaneswar (Bhubaneswer Municipal Corporation ) 17.95 7.84 7.84 1.80 5.06 5.06 10.12
41 Energy Efficient Project (Retrofitting)-Cuttack (Cuttak Municipal Corporation ) 26.16 11.25 11.25 2.62 9.10 9.10 18.20
42 Energy Efficient Project (Retrofitting)-( Berhampur Municipal Corporation ) 11.06 4.70 4.70 1.11 4.33 4.33 8.66
43 Energy Efficient Project (Retrofitting)-Rourkela (Rourkela Municipal Corporation) 10.18 4.33 4.33 1.02 3.46 3.46 6.92
44 Energy Efficient Project (Retrofitting)- (Sambalpur municipal corporation ) 13.38 5.85 5.84 1.34 5.84 5.85 11.69
45 Greenfield Street Lighting Project in 113 ULBs on PPP basis 264.52 39.68 39.68 26.45 39.68 39.68 79.36